What Comes In The Architectural Process?

The process of architectural design is comprised of several phases. In the initial stages, the designer will create a conceptual design of the building. Once this design is finalized, it is then time to choose materials and finishes. Top architecture firms in Dubai will then work on interior and exterior design choices. In this phase, they will also decide where electrical outlets and exit points should be placed and where plumbing systems should be located.

Schematic design:

The schematic design process begins with the architect sitting down with the owner to discuss the project’s goals. The architect will discuss the owner’s expectations, the requirements for the project, and the features they want to include. After analyzing the information provided, the architect will develop a series of possible design directions. These concepts will then be refined or eliminated based on the owner’s feedback. This process will continue until the final design schematic is selected.

Design development:

This process is often repetitive, iterative, and cyclical. It is not linear and often involves reacting to design issues or skipping back and forth among the phases. As the name suggests, design development is a vital step in the architectural process. It comprises about 20% of the total design work.

Construction documents:

Whether you’re looking to build a new house or renovate an existing one, construction documents are an important part of the architectural process. The documents include designs, drawings, specifications, and contract documents. These documents are the basis of the construction contract and ensure that the building is constructed as per design specifications. They should include architectural sheets, including the standard dimensions for walls, roofs, and foundations.

Production information:

Production information refers to the information required to build a building. It is produced by a design team, often a consultant team, or a specialist contractor. The information is often integrated into the contract or tender documentation. The quality of this information is very important, as it can cause delays on site or cost overruns. Depending on the type of contract and procurement system used, responsibility for production information may be split among several parties.

The structural phase’s output consists of blueprints, which specify the building’s general layout and volume. It also contains details about any significant equipment and materials. The next phase of the architectural process entails the concrete implementation of the design.